+1-780-447-5433
34208414
A dog walker training his puppy on a long lead on Fistral Beach in Newquay in Cornwall.
License: Rights Managed
Credit: © Loop Images Ltd. / Design Pics
Image Reference: 34208414
Model Release Status: Not Released
Property Release Status: Not Released

Use the calculator below to determine a price.

Pricing Calculator

Usage Category
Specific Use
Total Circulation
Image Size/Position
Distribution Area
Specific Area
Details Of Use
Number of Languages
Language(s)
Placement
Duration of Image Use
Industry (Hold CTRL to select more than one)
Start Date
End Date
Exclusivity
End User Client
Price is based on the uses and duration selected. For more information, please read our terms and conditions.
34208414 34208414 34208414 34208414
Our Family Of Brands
The Design Pics family brings together distinctly different imagery from several well-known boutique stock photography brands.
First Light
Pacific Stock
Alaska Stock
AgStock
Axiom Photographic
The Irish Image Collection
Disability Images
Masterfile
Printscapes